Customization: | Available |
---|---|
Media: | Water |
Certification: | CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
China co2 pressure regulator valve price
Description China co2 pressure regulator valve price
SLK- YR31 Series stainless steel pressure regulator adopts piston type decompression structure, outlet pressure is stable, mainly used for high inlet pressure requirements, suitable forhigh purity gas, standard gas, corrosive gas, and other gas.
Detailed Images China co2 pressure regulator valve price
Specification China co2 pressure regulator valve price
Max inlet pressure: 3000psi, 6000psig,10000psi
Outlet pressure: 0-250psig, 0-500psig, 0-1500psig, 0-3000psig. 0-6000psi
Safety testing pressure: 1.5 times of maximum inlet pressure
Working temperature: -23ºC~ 74ºC(-10°F ~ 165°F)
Leakage rate: 2*10-8 atm cc/sec He
CV value: 0.02, 0.06, 0.08, 0.2
Weight: About 1.5kg
Flow rate China co2 pressure regulator valve price
Designed features China co2 pressure regulator valve price
· Double stage decompression structure
· Valve body and diaphragm adopt hard seal form
· The internal structure is easy to clean
· Inside is equipped with filter
· Can be panel mounted
· Can choose needle valve, diaphragm valve for outlet
Selection China co2 pressure regulator valve price
Model | Valve material | Inlet pressure | Outlet pressure | Pressure gauge | Inlet port | Outlet port |
SLK-YR31 | 316L | 0-10000psi 0-6000psig 0-3000psig 0-1500psig 0-1000psig | 0-6000psig 0-4000psig 0-2000psig 0-1000psig 0- 500psig | With gauge (mpa) With gauge (psig) Without gauge | 1/4'' NPT(F) 3/8'' NPT(F) 1/2'' NPT(F) 1/2'' NPT(M) 3/8'' fitting Or custom | 1/4'' NPT(F) 3/8'' NPT(F) 1/2'' NPT(F) 1/2'' NPT(M) 3/8'' fitting Or custom |
Delated products
FAQ
Q: Are you manufacturer?
A: Yes, we are manufactuer
Q: Is there any certificate for this product?
A: Yes,we have CE certificate for our pressure regulator
Q: When can I get the reply from you?
A: We will reply you as soon as possible when we receive your inquiry, must be within 12 hours.
Q: When can I get the package after the payment?
A: Lead time is always about 3-5 days, and delivery time is about 1-5 working days.
Company Information